Mission timeline (as flown)¶
The model records the Apollo 11 flight as it actually happened, separately from the planned operations: an individual mission cut into consecutive timeslices (periods) tied to the planned mission phases, with snapshots (instants) that record mission time and other values, and the functions being performed. This page is for anyone who needs the as-flown record: operations reviewers, analysts comparing plan and actual, and newcomers who want the mission's chronology.
The flight is one example run through the nominal plan of the concept of operations: the concept defines the phases and the constraints that time them (see its trajectory and timing drivers); this page shows how one flight met them.
Flight timeline¶
A Gantt chart of the as-flown timeslices against mission elapsed time, each labelled with the planned mission phase it belongs to; diamonds mark the recorded snapshots.
Use it to see when each part of the flight happened and how long it lasted, and relate the flight to the planned mission phases.
The planned phases and their operations are described on the concept of operations page.
- The flight is a chain of 14 timeslices from
crewIngresstorecoveryAndQuarantine; every one is tied to a planned phase, covering 13 planned phases. - The longest periods are the coasts,
translunarCoast(72 h) andtransearthCoast(58 h); next islunarOrbitInsertion(22 h). translunarInjectionandtranspositionAndDockingshare the planned phaseTransLunarInjectionPhase.
Event log¶
Every recorded instant of the flight in time order, with its mission elapsed time, the period it belongs to, and the values recorded at that instant.
Use it to look up when a mission event happened and what the model records about the vehicle at that moment.
| MET (hhh:mm:ss) | MET [h] | Event | Period | Description | Recorded values |
|---|---|---|---|---|---|
| -002:30:00 | -2.50 | atIngress | crewIngress | The flight crew begins entering the Command Module 'Columbia'. | commandModule.cabinPressure = 101 kPa; missionSystem.location = Ingressing Command Module 'Columbia'; missionSystem.status = Performing pre-flight checks; commandModule.oxygenLevel = 21 % |
| -001:00:00 | -1.00 | atIngressComplete | crewIngress | Crew is secured and the Command Module hatch is sealed. | commandModule.cabinPressure = 34 kPa; commandModule.oxygenLevel = 100 % |
| 000:00:00 | 0.00 | atT0 | liftoff | State Activation: LaunchPhase begins with liftoff. | stage1.thrust = 35,100 kN; missionSystem.velocity = 0 m/s |
| 000:02:48 | 0.05 | atSICSeparation | liftoff | Separation Event: The S-IC first stage separates. | missionSystem.altitude = 67 km; missionSystem.velocity = 2,400 m/s |
| 000:09:00 | 0.15 | atSIISeparation | liftoff | Separation Event: The S-II second stage separates. | missionSystem.altitude = 185 km; missionSystem.velocity = 6,800 m/s |
| 002:47:16 | 2.79 | atTLI | translunarInjection | State Activation: TransLunarInjectionPhase begins with the S-IVB burn. | stage3.engineStatus = Burning |
| 002:53:04 | 2.88 | atTLIComplete | translunarInjection | The TLI burn is complete, placing the vehicle on a translunar trajectory. | missionSystem.status = Translunar trajectory established; missionSystem.velocity = 10,840 m/s |
| 003:10:00 | 3.17 | atCSMSeparation | transpositionAndDocking | Separation Event: The CSM separates from the S-IVB/SLA. | csm.status = Separated and maneuvering; csm.relativeVelocity = 0.5 m/s |
| 003:20:00 | 3.33 | atCSLMDocking | transpositionAndDocking | The CSM has turned around and is docking with the LM. | spacecraft.status = Soft docked; commandModule.dockingProbeStatus = Capture latches engaged |
| 004:00:00 | 4.00 | atExtractionComplete | transpositionAndDocking | The docked CSM and LM have been extracted from the S-IVB stage. | spacecraft.status = Docked stack extracted |
| 004:00:01 | 4.00 | atTLCStart | translunarCoast | State Activation: TransLunarCoastPhase begins. | spacecraft.status = Passive thermal control (barbecue roll) initiated |
| 075:51:50 | 75.86 | atLOI | lunarOrbitInsertion | State Activation: LunarOrbitInsertionPhase begins with the LOI burn. | serviceModule.engineStatus = Burning (SPS); serviceModule.fuelRemaining = 18,400 kg |
| 075:57:50 | 75.96 | atLOIComplete | lunarOrbitInsertion | The LOI burn is complete and the spacecraft is in a stable orbit. | missionSystem.status = In stable elliptical lunar orbit; missionSystem.orbitalParameters = 113km x 314km |
| 098:00:00 | 98.00 | atDescentPrep | descentPreparation | State Activation: LunarOrbitOperationsDescentPreparationPhase begins. | lm.powerStatus = Activated on internal batteries |
| 098:05:00 | 98.08 | atLMUndocking | descentPreparation | Separation Event: The LM undocks from the CSM. | |
| 100:03:25 | 100.06 | atPDI | poweredDescent | State Activation: PoweredDescentPhase begins with Powered Descent Initiation. | lunarModuleDescentStage.engineStatus = Burning; lunarModuleDescentStage.throttleLevel = 90 % |
| 100:15:40 | 100.26 | atLanding | poweredDescent | The Lunar Module 'Eagle' touches down in the Sea of Tranquility. | lunarModuleDescentStage.engineStatus = Shutdown; lunarModuleDescentStage.propellantRemaining = 45 kg |
| 106:45:00 | 106.75 | atEVAStart | lunarSurfaceOps | State Activation: LunarSurfaceOperationsPhase begins with the first EVA. | spaceSuits.status = Nominal; spaceSuits.oxygenRemaining = 6.5 h |
| 109:15:00 | 109.25 | atEVAEnd | lunarSurfaceOps | The EVA is complete and the crew are back inside the LM. | lm.samplesStowed = true; lm.cabinPressure = 34 kPa |
| 124:22:01 | 124.37 | atLunarLiftoff | ascentAndRendezvous | State Activation: LunarAscentRendezvousPhase begins with liftoff from the Moon. | |
| 127:50:00 | 127.83 | atLunarDocking | ascentAndRendezvous | The LM Ascent Stage has completed rendezvous and docks with the CSM. | missionSystem.status = Docked in lunar orbit, preparing for crew transfer |
| 132:55:00 | 132.92 | atTEI | transearthInjection | State Activation: TransEarthInjectionPhase begins with the TEI burn. | |
| 132:57:31 | 132.96 | atTECStart | transearthCoast | State Activation: TransEarthCoastPhase begins. | spacecraft.status = Passive thermal control (barbecue roll) initiated |
| 191:10:00 | 191.17 | atCMSMSeparation | reentryAndLanding | Separation Event: The Command Module separates from the Service Module. | |
| 191:25:00 | 191.42 | atReentry | reentryAndLanding | State Activation: ReentryLandingPhase begins as the CM hits the atmosphere. | commandModule.gForce = 6.5 gn; commandModule.heatshieldTemp = 2,760 K |
| 191:46:35 | 191.78 | atSplashdown | reentryAndLanding | The Command Module 'Columbia' splashes down in the Pacific Ocean. | |
| 192:30:00 | 192.50 | atRecovery | recoveryAndQuarantine | State Activation: RecoveryQuarantinePhase begins with crew retrieval. | |
| 193:00:00 | 193.00 | atRecoveryComplete | recoveryAndQuarantine | The Command Module is hoisted aboard the recovery ship. | commandModule.status = Secured on deck of USS Hornet |
Flight data¶
The trajectory values in the flight record: inertial velocity and altitude of the mission system at each event that records them.
Use it to check the ascent profile at staging events and the velocity reached at the end of the TLI burn.
From 0 m/s at atT0 the vehicle reaches 10,840 m/s at atTLIComplete: 98% of the escape velocity at the parking-orbit radius the model's Δv analysis uses (6,563 km, 11,021 m/s, computed by this page). Altitude is recorded at atSICSeparation, atSIISeparation only.
The other 33 recorded values, of 17 attributes (cabinPressure, dockingProbeStatus, engineStatus, fuelRemaining, gForce, heatshieldTemp, location, orbitalParameters, oxygenLevel, oxygenRemaining, powerStatus, propellantRemaining, relativeVelocity, samplesStowed, status, throttleLevel, thrust):
| MET [h] | Event | Subject | Attribute | Value |
|---|---|---|---|---|
| -2.50 | atIngress | commandModule | cabinPressure | 101 kPa |
| -2.50 | atIngress | missionSystem | location | Ingressing Command Module 'Columbia' |
| -2.50 | atIngress | missionSystem | status | Performing pre-flight checks |
| -2.50 | atIngress | commandModule | oxygenLevel | 21 % |
| -1.00 | atIngressComplete | commandModule | cabinPressure | 34 kPa |
| -1.00 | atIngressComplete | commandModule | oxygenLevel | 100 % |
| 0.00 | atT0 | stage1 | thrust | 35,100 kN |
| 2.79 | atTLI | stage3 | engineStatus | Burning |
| 2.88 | atTLIComplete | missionSystem | status | Translunar trajectory established |
| 3.17 | atCSMSeparation | csm | status | Separated and maneuvering |
| 3.17 | atCSMSeparation | csm | relativeVelocity | 0.5 m/s |
| 3.33 | atCSLMDocking | spacecraft | status | Soft docked |
| 3.33 | atCSLMDocking | commandModule | dockingProbeStatus | Capture latches engaged |
| 4.00 | atTLCStart | spacecraft | status | Passive thermal control (barbecue roll) initiated |
| 4.00 | atExtractionComplete | spacecraft | status | Docked stack extracted |
| 75.86 | atLOI | serviceModule | engineStatus | Burning (SPS) |
| 75.86 | atLOI | serviceModule | fuelRemaining | 18,400 kg |
| 75.96 | atLOIComplete | missionSystem | status | In stable elliptical lunar orbit |
| 75.96 | atLOIComplete | missionSystem | orbitalParameters | 113km x 314km |
| 98.00 | atDescentPrep | lm | powerStatus | Activated on internal batteries |
| 100.06 | atPDI | lunarModuleDescentStage | throttleLevel | 90 % |
| 100.06 | atPDI | lunarModuleDescentStage | engineStatus | Burning |
| 100.26 | atLanding | lunarModuleDescentStage | engineStatus | Shutdown |
| 100.26 | atLanding | lunarModuleDescentStage | propellantRemaining | 45 kg |
| 106.75 | atEVAStart | spaceSuits | status | Nominal |
| 106.75 | atEVAStart | spaceSuits | oxygenRemaining | 6.5 h |
| 109.25 | atEVAEnd | lm | samplesStowed | true |
| 109.25 | atEVAEnd | lm | cabinPressure | 34 kPa |
| 127.83 | atLunarDocking | missionSystem | status | Docked in lunar orbit, preparing for crew transfer |
| 132.96 | atTECStart | spacecraft | status | Passive thermal control (barbecue roll) initiated |
| 191.42 | atReentry | commandModule | heatshieldTemp | 2,760 K |
| 191.42 | atReentry | commandModule | gForce | 6.5 gn |
| 193.00 | atRecoveryComplete | commandModule | status | Secured on deck of USS Hornet |
Plan versus actual¶
A comparison of the flown record with the plan: mission duration, the order of the flown periods against the planned phase sequence, and the functions performed in each period.
Use it to spot deviations between the as-flown model and the planned operations, and see which logical components were active when.
| Planned phase (in plan order) | Flown periods | Start MET [h] | End MET [h] |
|---|---|---|---|
| preparation | crewIngress | -2.5 | 0.0 |
| launch | liftoff | 0.0 | 2.8 |
| tli | translunarInjection, transpositionAndDocking | 2.8 | 4.0 |
| tlc | translunarCoast | 4.0 | 75.9 |
| loi | lunarOrbitInsertion | 75.9 | 98.0 |
| lunarOpsDescentPrep | descentPreparation | 98.0 | 100.1 |
| poweredDescent | poweredDescent | 100.1 | 106.8 |
| lunarSurfaceOps | lunarSurfaceOps | 106.8 | 124.4 |
| lunarAscentRendezvous | ascentAndRendezvous | 124.4 | 132.9 |
| tei | transearthInjection | 132.9 | 133.0 |
| tec | transearthCoast | 133.0 | 191.2 |
| reentryLanding | reentryAndLanding | 191.2 | 192.5 |
| recoveryQuarantine | recoveryAndQuarantine | 192.5 | 193.0 |
- Splashdown is recorded at 191.8 h, 3.5 h earlier than the
plannedDurationofApollo11Mission(195.3 h, i.e. 8 days 3 h 18 min). The record continues after splashdown, up to 193.0 h. - The flown periods visit the planned phases in plan order.
Functions performed during the flight (38 performances by 5 logical components, see the functional architecture):
| Period | MET [h] | Logical components | Functions performed (by) |
|---|---|---|---|
| crewIngress | -2.5 | GroundSupportSystem | performCrewIngress (launchControlCenter) |
| liftoff | 0.0 | Crew, GroundSupportSystem, LaunchSystem | analyzeLaunchTelemetryFromGround (launchControlCenter); guideAscentTrajectory (launchVehicle); observeAscentDataFromCockpit (crew); provideOrbitInsertionThrust (launchVehicle); provideStage1Thrust (launchVehicle); provideStage2Thrust (launchVehicle) |
| translunarInjection | 2.8 | LaunchSystem | controlTranslunarInjectionBurn (launchVehicle); provideTranslunarInjectionThrust (launchVehicle) |
| transpositionAndDocking | 3.2 | Crew, Spacecraft | connectSpacecraft (crew); executeTranspositionManeuver (crew); mechanicallyLatchModules (spacecraft); provideAttitudeControlThrust (spacecraft) |
| translunarCoast | 4.0 | Crew, Spacecraft | monitorOnboardSystems (crew); provideAttitudeControlThrust (spacecraft) |
| lunarOrbitInsertion | 75.9 | Spacecraft | controlLunarOrbitInsertionBurn (spacecraft); provideLunarOrbitInsertionThrust (spacecraft) |
| descentPreparation | 98.0 | Crew, Spacecraft | performOrbitalSystemCheckouts (crew); prepareLanderForSeparation (crew); separateLanderFromOrbiter (spacecraft) |
| poweredDescent | 100.1 | Crew, Spacecraft | executeDescentBurn (spacecraft); manuallyPilotLander (crew); performPostLandingCheck (crew) |
| lunarSurfaceOps | 106.8 | Crew, EVASystem | completeExtravehicularActivity (crew); conductSurfaceExploration (commander); deploySurfaceExperiments (commander); gatherLunarSamples (commander); provideIndividualLifesupport (spaceSuits) |
| ascentAndRendezvous | 124.4 | Crew, Spacecraft | connectSpacecraft (crew); executeAscentBurn (spacecraft); transferCrewAndMaterials (crew) |
| transearthInjection | 132.9 | Spacecraft | executeTransearthBurn (spacecraft) |
| reentryAndLanding | 191.2 | Spacecraft | deployDecelerators (spacecraft); guideAtmosphericEntry (spacecraft); performSplashdown (spacecraft); separateReturnCapsule (spacecraft) |
| recoveryAndQuarantine | 192.5 | GroundSupportSystem | executeQuarantine (recoveryForces); retrieveVehicleAndCrew (recoveryForces) |